At the end of December, 4 new projects were completed in Koutoukpa (Togo), 180 km from Lomé.

The health post has been equipped with a solar installation allowing the production of electricity to power some medical devices, the fridge, to store medicines and vaccines, as well as the lighting in the different care, delivery and rest rooms.

Photovoltaic installations have also been installed in the elementary school, the secondary school and its administrative building, as well as the school farm. Evening classes can be held there.

These 4 buildings have been equipped with 450 WC solar panels, an OPZV OKAYA 24 x 2V/300 Ah battery pack and Victron inverters.

The covid-19 pandemic having caused a significant delay of these 4 projects and not facilitating the travel, the realization of these installations was entrusted to the local electricians of the company ARESS for the electrical and solar part.
The progress of the work was followed on a daily basis by our project manager, Freddy A., through the exchange of photos and videos showing the different phases of the work, the laying of the casing, the laying of the cables, the connection of the appliances and the electrical boxes.
This way of proceeding remotely from day to day (sometimes even from hour to hour) is not always easy, neither for the project manager nor for the local workforce, and requires a lot of exchange and adaptation, but allows our volunteers to share their expertise and know-how.

A short mission, in February 2022, allowed us to control and receive the installations on site.

   

Read More

This new mission, carried out end of January in Kenya by our volunteer colleagues Gregory H., Antoine D. and Tony MdH., allowed the electrical securing of a dryer and dehumidifier for spirulina.

.

These devices are essential to the production of spirulina produced by this Kenyan farm, set up by the association ‘Secteur 10’ in 2015, association active in the fight against hunger in Africa. The spirulina is then free of charge distributed to deficient or malnourished children in nearby clinics and schools. For this reasons, the association Secteur 10 has requested the help of Energy Assistance to overcome the numerous power cuts of the Kenyan electrical network, which hinder the drying and the production of spirulina.

.   

After nearly 3 years of work to realize the feasibility study, the study of the needs, the purchase of the material and the sending to Kenya with its multiple rebounds related to problems of customs clearance and covid-19, the mission of our volunteers could finally be programmed at the beginning of 2022.

Warmly welcomed by the team of Secteur 10 on the spot, our volunteers, with the help of their hosts, installed 3 WKS inverters of 5kVA each, 10 Lithium batteries of 2.4 kWh as well as 36 panels of 320 Wp which allow the spirulina farm to be independent from an energy point of view.

And of course, this week of work ended with the necessary training of the local managers in the operation of the installation.

 

Discover the video of the mission by clicking on the image below:

Thanks to Gregory H., Antoine D. and Tony MdH for their dedication and thanks to Secteur 10 for the welcome, for this beautiful collaboration and for the beautiful Energy Assistance logo hand painted by the beneficiaries.

   


Our beneficiaries thank us:
“Just a quick email to thank you for making the installation of the photovoltaic panels possible on our spirulina farm in Kenya. The mission on site ended mid-February for the Energy Assistance volunteers. Since then, everything has been working and the time with them went very well.
We are delighted to be totally independent from an energy point of view, to no longer have to suffer power cuts from the network, and also to be able to make big savings (about 1500 to 2000€ / year). The funds will be used to finance concrete humanitarian actions rather than to finance energy.
So, a BIG thank you ! And we look forward to being in touch again.”
Catelyne VW for Sector 10
En read also : https://www.secteur10.fr/bilan-sejour-secteur10-2022-au-kenya/
Read More

Claude G., one of our oldest volunteers, opens his memory box for us!

10 years ago, E.A. realized one of its most important projects, in partnership with SNEL Dept ER, important in terms of budget but also in terms of time: indeed, it took no less than 7 years and 3 missions to realize it.

Thanks to the efforts of Claude G. and Raphaël M. as well as Dominique K., Marcel B., Maxime P. who accompanied them on mission, the village of Kapolowe, with its Reference Hospital, its School Center and Boarding School for girls, its Primary and Secondary School Center for boys, its fishing village, its population (20,000 inhabitants) saw the “night light” on November 25, 2011!

   

.   

Read More

During this long period of pandemic, a new project was developed in Kolwezi, DRC, consisting in equipping 3 buildings of collective interest: a maternity, an orphanage and a school.

.  

The maternity hospital has been equipped with 3.3kWp panels, a 5kVA inverter charger and a set of 520A/h batteries, allowing to secure the lighting as well as the ultrasound scanner and some other devices. This allows the patients to receive improved care day and night.

In addition, the orphanage and school were also equipped with 3.9kWp of panels, a 5kVA inverter and a 1000A/h battery set, which will power the lighting of the orphanage as well as the school’s computer class.

 

This project could be carried out thanks to a great collaboration: the transport of the material was taken care of by the Belgian partner Philantros, who was also the initiator of the request for intervention. The work was carried out by the local partner, Jean Ilunga Asomwé, head of the association that runs the project.  In addition, our volunteer project manager Jacques H. supervised the work remotely via WhatsApp, in line with E.A.’s objective of transmitting the know-how of its members.

Thanks to the technical skills of Mr. Ilunga, the commissioning could be carried out successfully. A control mission will be organized in early 2022.

  .

Read More

Located in the center of Togo, about 350 km from Lomé, the medical center “La Source” in Sokodé called on Energy Assistance to secure its electrical installation. This region of Togo is supplied from Ghana but is subject to numerous power cuts.

This medical center also includes a maternity ward, an analysis laboratory, an X-ray room, an operating room, pediatric and cardiology consultations and welcomes approximately 100 patients per day. There is no doubt that stability and continuity of energy are important to ensure the various services.

The 2018 preparatory visit was critical in preparing for the mission and allowed for near-optimal sizing of the equipment.

A co-financing of almost 2/3 of the project by the beneficiaries, supported by doctors from the Ardennes who regularly visit the hospital, allowed the project of the installation of solar panels and a no-break solution.

.      .             

Delayed for almost two years by the covid-19 health crisis, the mission was finally able to take place in the first half of November 2021, with our fellow volunteers Benoît R., Christoph H. and a newcomer, Fabrice N.

The hospital was equipped with 30 panels delivering 9 kilowatt-peak, 24 high capacity batteries and 2 inverters of 5 kW each, managing the different energy sources: solar, batteries and Compagnie Energie Electrique du Togo.

     

Apart from the numerous PCR tests to be undergone and a few missing lightning fuses, the mission went very well, especially thanks to the valuable local help, both the center’s management staff and the local workers who participated in the various works!

      

These works were often the occasion to train the locals to new techniques for the future maintenance of the installations, which they will also be able to use for their own future.

Thank you to our volunteers and their hosts for this great mission realised beginning of November 2021 !   

Read More

After long months of waiting due to the Covid-19 pandemic, it became essential to realize these 6 projects in Casamance, Senegal, in order to support the local population. Indeed, the majority of the projects concerned the power supply of health posts.

In Adéane, a town of 9,000 inhabitants near Ziguinchor, the 5625 Wh installation with 15 PVs of 375 Wp now supplies the health post, but also the reception, the pharmacy, the laboratory and the accommodation for the staff on duty, and provides the electricity needed to operate the lighting as well as some medical equipment and a fridge for storing vaccines and medicines.

  

In the surrounding villages of Tambacoumba and Banghagha, the two dispensaries have been equipped with photovoltaic installations of respectively 2250 Wh with 6 PV of 375 Wp and 3750 Wh with 10 PV of 375 Wp, allowing to ensure a proximity care of the patients day and night.

Groupe Média Sud and Freddy A. explain everything in this report :

On the other side of the Casamance River, in Bloc Sefa, 15 km from Sedhiou, a 3240 Wh photovoltaic installation with 12 PVs of 270Wp recovered, also equips the health post. The elementary school and the secondary school also benefit from photovoltaic installations of respectively 2720 Wh with 8 new PV of 340 Wh and 4080 Wp with 12 PV of 340 Wp allowing to organize remedial classes in the evening.

In these 2 schools, the wells have also been equipped with solar pumps, each powered by 4 PV of 260Wp recovered, which allows them to ensure basic hygiene but also to rehabilitate the vegetable gardens around these buildings.

All the solar and electrical equipment was purchased from local companies and these 6 projects were carried out by local companies: ARESS, for the solar part and Mané & Frères for the electrical installation in Adéane and neighboring villages, and in Bloc Sefa: Synergie Plus and the NQE hardware store in Ziguinchor.

These different work sites were supervised remotely and almost live, by video and photos, by our volunteer project manager Freddy A. (Thanks Whatsapp and Gmail ?). Faithful to its objectives, Energy Assistance continues to transmit the know-how of its members.

At the beginning of October, our two volunteers Freddy A. and Marcel B. went to Casamance for a short mission of control and commissioning of the installations, warmly welcomed by the local populations.

In conclusion, we can only be satisfied with this first post-pandemic mission! Thank you to ARESS, Mané & Frères, Synergie plus and NQE for their seriousness and this beautiful collaboration and thank you to our volunteers for their unfailing commitment!

.

.

Read More

“I gave the computers to the two doctors on your behalf and they were very happy and asked me to warmly thank E.A.. These computers were used from the first Thursday of the mission” explains Marie-Claire P., a physiotherapist who is regularly on mission in Kabinda.

Connected to a video projector, these new PCs allow her to present, during team meetings, the different pathologies treated by physiotherapists and their management, thus ensuring better collaboration between departments.

A nice continuation of the photovoltaic installations installed by our volunteers in 2012.

Read More

For several months now, Energy Assistance has been investing in terms of analysis and technical and feasibility studies of the Panzi Hospital. After a period of interruption due to the COVID-19, the renovation works have just started.

Energy Assistance is the main contractor for the electricity production and for the internal installation of the renovation of the Operating room of the General Reference Hospital of Panzi.  This project supported by the ENGIE Foundation is obviously realized in close collaboration with the team of the Nobel Peace Prize winner, Doctor Mukwege and Professor Cadière.

Do not hesitate to contact us if you want to participate in this beautiful project!

      

Read More

Last December, we proposed you to participate in the crowdfunding of an original project and, this way, to support our association.

As a reminder, with her project ‘NOW YOU SEE ME – Social impact’, our colleague Marie-Alice had launched a creative challenge:  to put forward her passion for minimalist ethical fashion and upcycling according to 3 pillars (Roots – Multiculturality and Vulnerability) through a solidarity calendar. And to follow through on her commitment to solidarity, she shared the profits from the sale of the calendar between three associations, including Energy Assistance.

Weeks of hard work and beautiful encounters with the models, photographer, videographer, make-up artist, accessories, communication experts, printer, … allowed her to create this nice calendar and to sell nearly 150 copies! (https://www.facebook.com/BeeMwizaMagic)

 

Thanks to this beautiful experience and as promised, Marie-Alice was able to offer this check of 1050 € to our association, which will be used for the benefit of the electrification project of the maternity of Minova in DRC. We will not fail to keep you informed of the evolution of this project as soon as the sanitary measures will allow us to realize it.

Thank you Marie-Alice for the help brought to this project and allow us to admire these beautiful outfits and photos throughout the year.

 .

Read More

When inventiveness and determination combine to help a community in Kinshasa

The Kikwit region in DR Congo is a region that Energy Assistance knows well.  Our volunteers have carried out an umpteenth project to electrify a health centre for the Sisters of Mary in Kwango in 2018.  This congregation and that of the Sisters of Saint Andrew have also asked us for two other projects that we hope to carry out soon.

Parallel to these projects, the Congregation of the Sisters of Saint Andrew was asking for our help in studying the feasibility of a solar installation to complement grid power for a new Community House in Kinshasa.

In agreement with their architect, it was decided to connect large consumer appliances such as fridges, freezers, pumps, etc. to the public network and to use a solar network for appliances that require less energy or that have to operate 24 hours a day, and for lighting.  We then helped them to size the installation and obtain the best quotations.

Another way, in these times of crisis, to meet the objectives of our association by putting the skills and know-how of our members at the service of humanitarian projects, even at a distance.

Thanks to our volunteer experts in charge of the study of this project : Michel M., Jacques H. and Léon C. (from the companies ORES & ENGIE Solutions)

Read More